<fieldset id="gmjlihl"><colgroup id="gmjlihl"><ol id="gmjlihl"></ol></colgroup></fieldset>


    1. 
      


      <blockquote id="gmjlihl"><figcaption id="gmjlihl"><basefont id="gmjlihl"></figcaption></blockquote>
    2. Projects

        Details

        Home  > Projects > Details

        Guangzhou Line-6 Metro

        Published:2014-12-12Author:Source:Views:3089

        Profile: Starting from Jinshazhou Station, Baiyun District to Luogang District, across Liwan District, Yuexiu District and Tianhe District.

        Total length: 41.95 km with 32 stations

        The first two phases of Line 6 are under construction. The first 24.3 km long phase will run from Xunfenggang to Changban with 22 stations; the second 17.6 km long phase will run from Changban to Xiangxue with 10 stations. Three stations of the first phase and four stations of the second phase will be elevated. The line will run four-car trains, while stations of the second phase will be constructed to accommodate six-car trains in preparation for a split-off in the future. 

        Fire Alarm Spot: 60,000 

        50 PTW-3300 control panels and 50 Proworks softwares      

        PTW.FIRE.NET 


        分享到:
        Keywords:

        銷售部

        • Miss Liu Miss Liu

        客服部

        • Miss Tan Miss Tan
        您好,是時候升級你的浏覽器了!你正在使用 Internet Explorer 的過期版本,Internet Explorer 8 可以為你提供更快、更安全的浏覽體驗,提供更好的隐私保護。立即下載
        酥酥影院成年版免费